|
| |
Pinkerton Academy - Freshman BuildingDerry, NH New three story freshman school building approximately 135,900 square feet with culinary arts, kitchen, cafeteria, and lecture hall. It includes acid waste piping, plumbing piping, gas piping, oil piping, hydronic piping, ductwork, high efficiency oil and gas fired boilers, rooftop units, makeup air units, kitchen hoods, exhaust fans, radiant floor heat, fin radiation, heating coils, VAV boxes, air conditioning, plumbing fixtures, water booster pump, and roof drains. Eckman Construction Company Mechanical Cost $1,500,000 Click here for the photo gallery.Idlehurst Elementary SchoolSomersworth, NH Construction of a new (K-5) Elementary School - One story, approximately 80,000 square feet. It includes plumbing piping, gas piping, hydronic piping, ductwork, radiant floor heat, VAV’s, reheat coils, air handling units, high efficiency gas fired boilers, radiant panels, fin radiation, air conditioning, exhaust fans, plumbing fixtures, and roof drains. Bonnette, Page & Stone Mechanical Cost $1,300,000 Click here for the photo gallery.Fairgrounds Elementary SchoolNashua NH The project consists of a mechanical system renovation for a 68,000 square foot elementary school. New mechanical systems will require the construction of several mechanical rooms and chases within the building.HVAC renovation including new heating plant, hot water supply and return piping, ductwork, air handling units, energy recovery units, make up air units, cabinet unit heaters, air conditioning, exhaust systems, kitchen exhaust system, and fin radiation. Harvey Construction Mechanical Cost $1,110,000 Click here for the photo gallery.Londonderry Freezer WarehouseLondonderry, NH The project consists of a 75,400 sq ft -10ºF freezer, 3,200 sq ft two-story
utility/compressor room and 10,000 sq ft two-story office area addition for a total
building footprint of 82,000 sq ft. The addition will be attached to the existing
Londonderry Freezer Warehouse Facility.
We will be installing a complete plumbing system consisting of bathrooms, (2) commercial kitchens, and storm drains.
We will be installing in HVAC system consisting of an air conditioning system, exhaust ventilation system, ductwork, and controls. Stahlman Group Mechanical Cost $550,000 Click here for the photo gallery.St. Mary's Bank Operations CenterManchester, NH This project consists of completely renovating an existing 31,317 sq ft building into an office area and adding a 263 sq ft addition. The entire facility shall be served by a dedicated natural gas high efficiency boiler plant.
The HVAC system will consist of DX cooling only rooftop units with duct mounted hot water heating coils, cabinet unit heaters, ductwork and exhaust ventilation system.
The plumbing system consists of bathrooms, gas fired water heater, and storm drains. Harvey Construction Mechanical Cost $575,000 Click here for the photo gallery.Miscellaneous ProjectsVarious Locations throughout NH Numerous small boiler room design build and replacement projects. Click on photo and read caption for photo and project details ECKHARDT & JOHNSON Mechanical Cost $0 Click here for the photo gallery.PSNH Legends Dr HooksettHooksett, NH Construction of a new 67,640 square foot building consisting of office space, warehouse/enclosed loading dock, truck garage, electricians workshop, mezzanine over office area and related support spaces. It includes plumbing piping, gas piping, hydronic piping, ductwork, radiant floor heat, variable refrigerant volume heat pumps, energy recovery units, unit heaters, high efficiency gas fired boilers, fin radiation, exhaust fans, plumbing fixtures, trench drains, and roof drains. Hutter Construction Mechanical Cost $1,000,000 Click here for the photo gallery.
Current Clients
|
Bellevance Beverage Co. Cameron Real Estate, Inc. Crotched Mountain Rehabilitation Center Epping School System Franklin Regional Hospital Globe Manufacturing Hillcrest Terrace Retirement Hitchiner Mfg. Hopkinton School System Hunt Community Center Seacoast Hyder Family Hospice Lakes Region General Hospital Manchester Country Club Mareld Company, Inc. Merrimack Street Volvo Metal Casting Technology McDowell Realty, LLC Milford Lumber Milford School District Nashua Housing Authority New Hampshire Employment Security New Hampshire D.O.T. New Hampshire State Liquor Commission New Hampshire Department of Safety
|
|
Osram Sylvania Products, Inc. Pat's Peak Pinkerton Academy Sisters of the Presentation of Mary Stewart Property Management Stonyfield Farm Trinity High School United Parcel Service University of New Hampshire Walmart Distribution Center Winnisquam Schools
|
|
|
|
|
|