Eckhardt & Johnson  
Employee Login:


Our ServicesPortfolioAbout Eckhardt & JohnsonQualification StatementCareersContact Us
  Current

Pinkerton Academy - Freshman Building

Derry, NH
New three story freshman school building approximately 135,900 square feet with culinary arts, kitchen, cafeteria, and lecture hall. It includes acid waste piping, plumbing piping, gas piping, oil piping, hydronic piping, ductwork, high efficiency oil and gas fired boilers, rooftop units, makeup air units, kitchen hoods, exhaust fans, radiant floor heat, fin radiation, heating coils, VAV boxes, air conditioning, plumbing fixtures, water booster pump, and roof drains.
Eckman Construction Company
Mechanical Cost $1,500,000
Click here for the photo gallery.

Plymouth State Ice Arena

Plymouth State University, Plymouth, NH
.
Wright Ryan Construction
Mechanical Cost $1,425,000
Click here for the photo gallery.

Idlehurst Elementary School

Somersworth, NH
Construction of a new (K-5) Elementary School - One story, approximately 80,000 square feet. It includes plumbing piping, gas piping, hydronic piping, ductwork, radiant floor heat, VAV’s, reheat coils, air handling units, high efficiency gas fired boilers, radiant panels, fin radiation, air conditioning, exhaust fans, plumbing fixtures, and roof drains.
Bonnette, Page & Stone
Mechanical Cost $1,300,000
Click here for the photo gallery.

New Hampshire Technical Institute - MacRury Hall

Concord, NH
The interior renovations of an existing two story 22,000 square foot academic building that includes a plumbing system that consists of lab work that contains acid waste and vent piping, lab air piping, acid neutralization tank, plumbing fixtures, and roof drains. This job has a hydronic system that consists of a new high efficiency gas fired boiler, radiant panels, and a Daikin multi-split air conditioning system.
Milestone Engineering & Construction
Mechanical Cost $827,800
Click here for the photo gallery.

Huntington at Nashua - Phase II

Nashua, NH
New Entry Addition approximately 11,840 square feet with associated renovations of approximately 4,615 square feet and an assisted living addition of approximately 5,760 square feet with associated renovations of 422 square feet that includes plumbing piping, hydronic piping, ductwork, adding one boiler section to each of the three existing boilers, fin radiation, rooftop units, energy recovery unit, exhaust fans, radiant floor heat, plumbing fixtures, and roof drains.
C.E. Floyd Company
Mechanical Cost $372,000
Click here for the photo gallery.

MHRA South Porter Street

Manchester, NH
This building is an elderly housing unit that is three stories, wood framed and 32,500 square feet that includes a commercial kitchen, radon system, hydronic heating system that consists of gas fired boilers, fin radiation, cabinet unit heaters, air handling units, heat recovery units, and air conditioning. The plumbing system includes fixtures, commercial kitchen, indirect water heaters, and laundries.
Eckman Constrution Company
Mechanical Cost $690,000
Click here for the photo gallery.

Current Clients

Bellevance Beverage Co.
Cameron Real Estate, Inc.
Crotched Mountain Rehabilitation Center
Epping School System
Franklin Regional Hospital
Globe Manufacturing
Hillcrest Terrace Retirement
Hitchiner MFG.
Hopkinton School System
Hunt Community Center
Seacoast Hyder Family Hospice
Lakes Region General Hospital
Manchester Country Club
Mareld Company, Inc.
Merrimack Street Volvo
Metal Casting Technology
McDowell Realty, LLC
Milford Lumber
Milford School District
Nashua Housing Authority
New Hampshire Employment Security
New Hampshire D.O.T.
New Hampshire State Liquor Commission
New Hampshire Department of Safety

Osram Sylvania Products, Inc.
Pats Peak
Pinkerton Academy
Sisters of the Presentation of Mary
Stewart Property Management
Stonyfield Farm
Trinity High School
United Parcel Service
University of New Hampshire
Walmart Distribution Center
Winnisquam Schools

 

 
Learn what can Eckhardt and Johnson do for you?
Learn About Eckhardt & Johnson